County reviewers compare architectural, structural, and service drawings for consistency. Mismatched set-backs or structural grid lines are the most common reason for rejection — not the fee payment itself.
Keep NCA and county timelines separate
Contractor registration with NCA and county plan approval are related but distinct. Homeowners should confirm both are in place before mobilising plant on site.
Related projects
See this topic on site
Related services
Work with Zytech on this topic
Related reading
More from the Knowledge Centre
Cost & planning
BOQ basics: how plan estimation protects your budget
Why a detailed BOQ beats lump-sum guessing for Kenyan residential and commercial builds.
Site works
Preparing a Kenyan residential site for construction
From access roads to platform levels — what must happen before the slab is poured on a Nairobi or Kiambu plot.
Materials & finishes
Steel pergola frames for covered walkways
Design and sequencing tips for pergola steel before cladding, roofing, and paving trades arrive.
Next step
Ready to build something that lasts?
Tell us about your project and get a detailed quotation from our estimation team within 48 hours.