Commercial
Karen Brookhouse International School
Structural and finishing works carried out for Karen Brookhouse International School.
100% · Completed
The build, chapter by chapter
How this project came together
-
01
Site clearance — ballast and compound path laid
Gravel bedding laid for the compound access path.
-
02
Compound grading and landscaping underway
Grading and hedge planting in progress around the gravel bed.
-
03
Compound ground works in progress
Open compound area during ground preparation.
Compound ground works in progress
-
04
Courtyard seating area completed
Finished paved courtyard with seating and shade umbrellas.
-
05
Covered walkway structure under construction
Steel roof framework being erected over the connecting walkway.
-
06
Interior strip-out and demolition
Old flooring and tiling removed ahead of refinishing.
Interior strip-out and demolition
-
07
Scaffolding erected on exterior wall
Scaffolding set up against the building facade for exterior works.
Scaffolding erected on exterior wall
-
08
Finished interior — furniture installed
Completed room with furniture in place.
Finished interior — furniture installed
-
09
Door and timber fittings ready for installation
Timber doors and fittings staged for fitting.
Door and timber fittings ready for installation
-
10
Completed two-storey building exterior
Finished exterior with balustrades and landscaping.
-
11
Completed washroom
Finished washroom with fittings installed.
Completed washroom
-
12
Completed covered walkway
Finished covered walkway connecting the building wings.
Completed covered walkway