Structural and finishing works carried out for Karen Brookhouse International School.

Progress

100% · Completed

The build, chapter by chapter

How this project came together

  1. 01

    Site clearance — ballast and compound path laid

    Gravel bedding laid for the compound access path.

    Site clearance — ballast and compound path laid
  2. 02

    Compound grading and landscaping underway

    Grading and hedge planting in progress around the gravel bed.

    Compound grading and landscaping underway
  3. 03

    Compound ground works in progress

    Open compound area during ground preparation.

  4. 04

    Courtyard seating area completed

    Finished paved courtyard with seating and shade umbrellas.

    Courtyard seating area completed
  5. 05

    Covered walkway structure under construction

    Steel roof framework being erected over the connecting walkway.

    Covered walkway structure under construction
  6. 06

    Interior strip-out and demolition

    Old flooring and tiling removed ahead of refinishing.

  7. 07

    Scaffolding erected on exterior wall

    Scaffolding set up against the building facade for exterior works.

  8. 08

    Finished interior — furniture installed

    Completed room with furniture in place.

  9. 09

    Door and timber fittings ready for installation

    Timber doors and fittings staged for fitting.

  10. 10

    Completed two-storey building exterior

    Finished exterior with balustrades and landscaping.

    Completed two-storey building exterior
  11. 11

    Completed washroom

    Finished washroom with fittings installed.

  12. 12

    Completed covered walkway

    Finished covered walkway connecting the building wings.

Next step

Ready to build something that lasts?

Tell us about your project and get a detailed quotation from our estimation team within 48 hours.